Camper being collected friday after all necessary works have been completed.
Since it was taken in in October, this will be the first time i have driven it.
Total work done,
1. Diagnose engine/Emission fault.
2. Tidy front and rear corner panels.
3. Replace rear O/S and N/S floor from underside and fit extra cross members to support rear floor.
4. Repair hole in front O/S wing.
5. Fabricate steel to replace corroded structure on O/S Door step.
6. Fabricate steel to reinforce front cross member.
7. Replace front O/S Steel brake pipe.
8. Repair fuel lines (Leaking).
9. Replace front exhaust clamp and rubber.
10. Refit rear O/S helper spring into original holding.
11.Replace Engine with 2nd hand 1992 1.9td diesel from East Coast Camper
12. New water pump and kit.
13. Timing belt kit
14. New Fuel pump
15. New thermostat
16. New Starter Motor
Total overall spend: € 3650.
That means the paint job is now put on hold till after Christmas.
However, if this means I will be driving trouble free, its a small price to pay.
Since it was taken in in October, this will be the first time i have driven it.
Total work done,
1. Diagnose engine/Emission fault.
2. Tidy front and rear corner panels.
3. Replace rear O/S and N/S floor from underside and fit extra cross members to support rear floor.
4. Repair hole in front O/S wing.
5. Fabricate steel to replace corroded structure on O/S Door step.
6. Fabricate steel to reinforce front cross member.
7. Replace front O/S Steel brake pipe.
8. Repair fuel lines (Leaking).
9. Replace front exhaust clamp and rubber.
10. Refit rear O/S helper spring into original holding.
11.Replace Engine with 2nd hand 1992 1.9td diesel from East Coast Camper
12. New water pump and kit.
13. Timing belt kit
14. New Fuel pump
15. New thermostat
16. New Starter Motor
Total overall spend: € 3650.
That means the paint job is now put on hold till after Christmas.
However, if this means I will be driving trouble free, its a small price to pay.