Gotta love this weather!
Seeing as the forecast is good for the next few days I figured it'd be a good time to work on the roof. I left my repairs too late in the season last year and the weather turned cold and wet before I could make a permanent job on the roof, so I only did a temporary job back then. This weekend was all about stripping back the patch jobs and making a proper fix up on top.
All of the roof lights and vents were fine. They were re-sealed last year. it was the rest of the roof that needed work, especially the roof trim..
It took a long time to scrape away the older silicone sealant that was there 10+ years, using a paint scraper and all of the patience that God gave to me... I was trying to completely remove
all traces of silicone from the trim to ensure the new sealant and paint would bond properly. Lets say my Dad was
very generous slapping on the silicone!
The aluminium roof skin is only 0.8mm thick so I had to be careful not to go too hard on it with any tools!
The job involved scraping 99% the silicone off with various scraper tools (which took most of Saturday), then wiping it all clean with acetone to remove what was left. Then a gentle scuff over the whole roof with a wirewheel, then another lash with 120 grit sandpaper on a random DA sander, then a blowdown with compressed air and then a final wipe down with panel cleaner...
Removing the trim around the perimeter of the roof was a pain. The heads on many of the Robertson screws were rusted badly so I had to grind down the top of a small vice-grips so I could clamp onto the stubborn screw heads and twist them out.
The roof trim should have had this vinyl insert covering the screws but it was long gone. Each screw a potential leak source, and there are hundreds! We had several leaks along the trim. So once I have the old aluminium trim fitted and the screws bedded in acrylic sealant, I'll get some of that vinyl insert and fit it. I'm sure I have a roll of it somewhere.
Something old something new
So all of that prep-work is done now and we're ready to reinstall the trim. Hopefully I'll get it back in place over the next evening or two. With a bit of luck, I'll get the roof fully painted & sealed by the end of the week using this flexible roof sealer that I got in B&Q last year:
The rest of the weekend was spent doing odd jobs.
The original dining table was made of chip-board. It got wet years ago and swelled up to the point it had become soft. So a new table was needed. I have a few big pieces of 18mm water-resistant MDF (Medite), so I'll use those for the new table. I wanted to re-use the formica from the old table so I searched youtube for a how-to guide on how to remove it. A guy showed a slick method of using acetone and an old kitchen knife... It worked very well.

A little bit scary though..
I also cleaned up the roof rails and got them ready to go back in place: (This pic tells me I need to do some
weeding and some power washing next weekend

)
I got another couple of sockets installed too. I'm way behind schedule with the electrical re-wiring. I got kinda bored of it...
Same as the sockets in the galley, the blank plate on top
will eventually have a 12v power socket.
My son is on his summer holidays at the moment so he's "raising dust" inside in the camper with his electric sander. Sanding back the face-frames on all of the cabinets... Doing a great job too (proud dad).